Quality is the product

Every part we deliver is backed by documented processes, material traceability and a defined certification roadmap. Our quality system is designed for the rail industry today and being formally certified against it by 2027.

Certifications

Current status & 2027 roadmap

An honest view — what we hold today, and what we are actively working towards. No overstatements.

ISO 9001:2015
Quality Management System — general industrial QMS
Certified
ISO/TS 22163
IRIS — Railway Quality Management System
In progress — target 2027
EN 15085-2
Railway Welding — welding of rail vehicles and components
In progress — target 2027
REACH / RoHS
Material substance compliance for supplied parts
In progress — target 2027
DIN 6701
Adhesive bonding on rail vehicles and vehicle parts
In progress — target 2027
ISO 14001:2015
Environmental Management System
In progress — target 2027

Quality Process

Six-step flow, applied to every project

  1. 01
    Enquiry & NDA
  2. 02
    Drawing Review & RFQ
  3. 03
    Supplier Qualification
  4. 04
    Inspection & Approval
  5. 05
    Series Production
  6. 06
    CoC & Delivery
Enquiry & NDA

NDA available on request. RFQs acknowledged within 24 hours.

Drawing Review & RFQ

DFM review, tolerance stack-up analysis and technical clarification before quotation.

Supplier Qualification

Route selection between in-house and our qualified partner network based on process, tolerance, volume and certification requirement.

Inspection & Approval

First-article inspection, CMM reports and PPAP-style approval on request before series release.

Series Production

Batch traceability, ongoing SPC where required, and scheduled progress reporting.

CoC & Delivery

Certificate of Conformity, EN 10204 3.1 material certificates and dimensional reports delivered with every shipment.

Documentation Standard

What ships with your parts

  • Certificate of Conformity (CoC) per shipment
  • EN 10204 3.1 material certificates for metallic parts
  • Dimensional inspection report (FAI on request)
  • Substance / REACH declarations
  • Fire-behaviour data sheet (rail interior parts)
  • Full drawing revision traceability

Start a Project

From drawing to delivery — one supplier.

NDA on request. RFQs acknowledged within 24 hours. Full quotation in 3–5 working days.